Back to Case Studies
Defense & Intelligence

Aegis achieved FedRAMP High authorization in 9 months with Novastraxis

Aegis Global Network deployed in Novastraxis GovCloud with ITAR-compliant enclaves, leveraged the ATO-in-a-Box accelerator, and secured the largest DoD contract in their history.

Aegis Global Network

Defense Contractor & Intelligence Services

Sector

Defense Contractor

Employees

8,500

Headquarters

Arlington, VA

Industry

Defense & Intelligence

Key Results at a Glance

9 months

To FedRAMP High P-ATO

420

Controls Documented Automatically

$240M

DoD Contract Secured

99.999%

Uptime Across Classified Workloads

67%

Reduction in Compliance Staffing

The Challenge

A $240M contract hinged on achieving FedRAMP High in half the usual time

Aegis Global Network, an 8,500-person defense contractor headquartered in Arlington, Virginia, was pursuing the largest contract in their history: a $240M multi-year Department of Defense program. The contract required FedRAMP High authorization, IL4/IL5 data handling, CMMC Level 3 certification, and ITAR-compliant infrastructure. Their existing cloud provider could not meet these requirements, and the standard 18-month authorization timeline would miss the RFP deadline by seven months.

$240M Contract at Risk

A critical Department of Defense contract required FedRAMP High authorization and IL4/IL5 data handling capabilities. Without authorization, Aegis would be disqualified from the competitive bid and lose the opportunity entirely.

Unacceptable Authorization Timeline

The industry-average FedRAMP High authorization process takes 18 months. The DoD contract RFP deadline was 11 months away, making the standard timeline completely unworkable for Aegis.

IL4/IL5 Compliance Gaps

The previous cloud provider could not meet Department of Defense Impact Level 4 and Impact Level 5 requirements for Controlled Unclassified Information (CUI) and mission-critical workloads.

ITAR-Controlled Data Handling

International Traffic in Arms Regulations (ITAR) required that all technical data be processed and stored exclusively by U.S. persons in U.S.-based facilities with strict access controls and audit trails.

420 NIST 800-53 Controls

FedRAMP High authorization requires documentation and continuous monitoring of 420 security controls from NIST 800-53 Rev. 5. Manual documentation and evidence gathering was projected to require 14 months alone.

CMMC Level 3 Requirements

Beyond FedRAMP, the DoD contract required Cybersecurity Maturity Model Certification (CMMC) Level 3, adding 130 additional practices that needed to be implemented, documented, and assessed.

The Solution

GovCloud infrastructure with an accelerated authorization pathway

Novastraxis deployed a purpose-built GovCloud environment with ITAR-compliant enclaves and leveraged the ATO-in-a-Box accelerator to compress the FedRAMP High authorization timeline from 18 months to 9 months, without cutting corners on control implementation or assessment rigor.

Novastraxis GovCloud Deployment

Deployed all workloads in Novastraxis GovCloud, a physically isolated cloud environment operated exclusively by U.S. persons with Secret-level clearances. GovCloud provides dedicated infrastructure that meets FedRAMP High, DoD IL4/IL5, and ITAR requirements by design.

Zero-Trust Fabric with FIPS 140-2

Implemented identity-aware microsegmentation using FIPS 140-2 Level 3 validated cryptographic modules for all data in transit and at rest. Every network request, API call, and data access is authenticated, authorized, and logged through the Zero-Trust Fabric.

Learn about Zero-Trust Fabric

ATO-in-a-Box Accelerator

Leveraged the Novastraxis ATO-in-a-Box accelerator framework that provides pre-built control implementations, evidence templates, and automated assessment workflows. This accelerator reduced the authorization timeline by automating 73% of documentation requirements.

Compliance Automation Engine

Configured continuous compliance monitoring for NIST 800-53 Rev. 5 (all 420 controls), CMMC Level 3 (130 practices), and ITAR technical data handling requirements. Real-time dashboards provide auditors and assessors with continuous visibility into control effectiveness.

View Compliance Capabilities

The Results

Authorization achieved. Contract awarded. Mission accomplished.

Aegis Global Network not only met the aggressive authorization timeline but also established a continuous compliance posture that positions them for future DoD contract opportunities.

9 months

To FedRAMP High P-ATO

Before

18-month industry avg

After

9 months

Aegis achieved a FedRAMP High Provisional Authority to Operate (P-ATO) in 9 months, half the industry average. The ATO-in-a-Box accelerator and Compliance Automation Engine automated the most time-intensive aspects of the authorization process.

420

Controls Documented Automatically

Before

Manual documentation

After

73% automated

Of the 420 NIST 800-53 Rev. 5 controls required for FedRAMP High, 307 were documented automatically through the Compliance Automation Engine. The remaining 113 controls required minimal manual input with pre-built evidence templates.

$240M

DoD Contract Secured

Before

Contract at risk

After

Contract awarded

With FedRAMP High authorization in hand before the RFP deadline, Aegis submitted a fully compliant proposal and was awarded the $240M multi-year Department of Defense contract, the largest in the company's history.

99.999%

Uptime Across Classified Workloads

Before

99.95%

After

99.999%

Five-nines uptime across all classified and mission-critical workloads in the GovCloud environment. Redundant availability zones and automated failover ensure continuous operation even during infrastructure maintenance events.

67%

Reduction in Compliance Staffing

Before

24 FTEs

After

8 FTEs

Continuous compliance monitoring and automated evidence collection reduced the compliance operations team from 24 full-time equivalents to 8 senior compliance engineers. The remaining team focuses on strategic risk management rather than manual documentation.

Implementation Timeline

9 months from gap assessment to P-ATO

The accelerated authorization pathway compressed an 18-month industry-average process into three tightly coordinated phases, with continuous 3PAO engagement throughout.

Phase 1

Gap Assessment & Architecture

Months 1 - 3

  • Comprehensive gap analysis against FedRAMP High, NIST 800-53 Rev. 5, CMMC Level 3, and ITAR requirements
  • GovCloud environment architecture design with IL4/IL5 data classification and handling procedures
  • ITAR enclave design with U.S.-person-only access controls and physical isolation requirements
  • 3PAO (Third Party Assessment Organization) selection and engagement for independent assessment
  • System Security Plan (SSP) development with automated control documentation from ATO-in-a-Box
  • Executive steering committee formation with CISO, General Counsel, and DoD program management

Phase 2

Implementation & Assessment

Months 4 - 7

  • GovCloud deployment of all mission-critical workloads with ITAR-compliant data handling pipelines
  • Zero-Trust Fabric activation with FIPS 140-2 Level 3 validated encryption across all communication paths
  • Compliance Automation Engine deployment for continuous monitoring of all 420 FedRAMP High controls
  • CMMC Level 3 practice implementation across 17 capability domains
  • 3PAO readiness assessment and remediation of 23 identified findings
  • Security Assessment Report (SAR) preparation and submission to FedRAMP PMO

Phase 3

Authorization & Contract Award

Months 8 - 9

  • 3PAO final assessment and authorization recommendation to the Joint Authorization Board (JAB)
  • FedRAMP High P-ATO granted by the JAB following successful review of SAR and POA&M
  • CMMC Level 3 certification achieved through independent C3PAO assessment
  • DoD contract proposal submission with full FedRAMP High and CMMC Level 3 compliance documentation
  • Contract award notification and transition planning for DoD workload onboarding
  • Continuous monitoring program activation with real-time compliance dashboard for FedRAMP PMO
“We were told by every other provider that FedRAMP High in under a year was impossible. Novastraxis proved them wrong. Their GovCloud infrastructure and ATO-in-a-Box accelerator didn't just meet our timeline — they gave us a compliance posture that is now a competitive differentiator for every DoD opportunity we pursue. The $240M contract was the beginning, not the end.”

Colonel (Ret.) David Harmon

Chief Information Security Officer, Aegis Global Network

Your Turn

Need FedRAMP authorization on an accelerated timeline?

Our GovCloud team has helped dozens of defense contractors achieve FedRAMP High, IL4/IL5, and CMMC certifications. Talk to us about your authorization requirements.

Request Enterprise Demo